TRAC celebrates success at construction awards

We are delighted to announce that we have won an award for our health and safety practices. At an awards evening held at the Hilton Birmingham Metropole hotel we were presented with Best Health & Safety Record by Briggs and Forrester– a leading player in the building services market. More than 300 guests from more…

Read More

Air-Con Case Study: Prodrive

Prodrive is a world-leading motorsport and technology business that trades in the automotive, marine, aerospace and defence sectors. Creating championship-winning cars needs headquarters to match and for its third base – to which Prodrive relocated in March 2015 – the expertise of TRAC was sought. As ever, large and complex projects posed no challenge for…

Read More

Case Study: Wolverhampton Youth Zone

Wolverhampton Youth Zone – aka The Way – is a purpose-built facility for the city’s young people, offering a range of activities including sports, dance, arts, music, media and enterprise. Given predicted high levels of usage, comfort at this high-profile environment was paramount In TRAC’s approach. While that has always been TRAC’s philosophy, this project…

Read More

Briggs and Forrester

Air-Con Installation We have recently completed our largest VRF installation. The site is in Reading and was carried out on behalf of Briggs and Forrester. The site comprises of 16,000m2 of office space over eight floors and is served via 32 Mitsubishi Electric VRF heat recovery condensers connected to a total of 440 ducted fan coil…

Read More

Is Your Workplace Full of Hot Air?

With the summer months fast approaching, West Midlands based firm TRAC, the providers of commercial air conditioning solutions to various businesses and developers, is advising office and retail premises owners to get prepared. Ian Lowe, managing director at TRAC comments: “With our summers becoming hotter and hotter, businesses are dramatically starting to notice its effect…

Read More